Employer: MKC JV
Design elaboration date: 2008
The Concession Agreement has established between the Ministry of Environment, Physical Planning and Public Works of Greece and the Concessionaire’s Joint Venture “Aegean Motorway S.A” that has undertaken the management and operation of the Motorway for 30 years.
The E/M design concerns the 3 twin Tunnels of motorway in the area of Tempi and Platamon with total length 21,500 m, 6 tunnel E&M buildings and 3 tunnel ventilation buildings (for tunnel T2) as follows:
Tunnel T1N – Tembi 1: 2x400m (G.U. 11)
Tunnel T2 – Tembi 2: T2S 2x800m (G.U. 13)
T2N 2x1000m (G.U. 13)
Tunnel T3 – Platamon: T3S 2x500m (G.U. 18)
T3N 2x600m (G.U. 18)
The E/M designs includes the following installations :
• Tunnel electrical power supply network and substations
• Tunnel lighting system
• Ventilation system
• Fire fighting system
• Fire detection system
• Scada & communication network
• Traffic Information & control system
• Closed circuit television system
• Emergency phone and public address installation system
• Radio communication system
• Service Buildings
• Infrastructure