DESCRIPTION
Employer: J/V APION KLEOS
Design elaboration date: 2008 – today
E/M design for existing installations:
- Electrical power supply and distribution networks
- Road lighting installation (open road, interchanges, intersections, parking areas, MSS areas, toll stations etc)
- Irrigation, fire fighting and pumping stations
- Irrigation control system
- WC Water supply and sewage in motorway parking areas and MSS areas
- The existing frontal toll stations
- The “Kakia Skala” tunnels installations
- Τhe Patra By-Pass tunnels installations
New E/M designs for new and existing installations:
- Open road E/M installations
- Infrastructure installations
- Continuous road lighting
- Toll stations lighting
- Toll stations buildings
- Toll stations supporting buildings
- Irrigation
- Pumping stations
- WC
- Motorway parking areas
- Tunnels E/M installations
- Τ7-Τ8 Tunnels (Derveni)
- Τ11 Tunnel (Mavra Litharia)
- Τ13Α-Τ13Β Tunnels (Akrata)
- Τ15 Tunnel (Platanos)
- Τ25-Τ26 Tunnels (Panagopoula)