Employer: AKTOR
Address: Albania
Design Elaboration Date: 2011
Twin tunnel in the Tirana-Elbasan Motorway. The south branch length is 2.623,29 m and the north branch 2.355,46 m.
The design included the tunnels’ E/M installations:
• Electrical power distribution networks and substations
• Lighting
• Fire fighting
• Fire detection
• CCTV System
• Traffic management system
• VMS
• SCADA system
• Radio communication system
• Ventilation
• Emergency stations
• Emergency telephones
• Traffic lights
• Communication system
• Infrastructure network
and the tunnel service buildings:
Electrical power distribution networks
• Lighting
• Fire fighting
• Fire detection
• HVAC
• Potable water
• Sewage
• Communication systems (voice / data)